Blog

The Hysopt Sensitivity Analysis

Discover our latest addition to the software: the Sensitivity Analysis.

As an HVAC systems designer, have you ever been in doubt about how much power a heat pump will need, which is the most optimal size for a thermal store, or how your system will perform when you lower the supply temperature? From now on, the new Sensitivity Analysis feature of the Hysopt software allows you to immediately investigate how certain design changes affect the overall system performance.

Thanks to the computational power of our cloud servers, our software can now help you make the right designchoices more efficiently and guide you towards the most optimal system design faster than ever before.

The Sensitivity Analysis allows you to make multiple variants of your model, each with minor parameter changes.

Next, all design computations and simulations will be executed automatically and simultaneously for all variants.

As a final step, the results of these simulations can be compared in our recently introduced Pareto analysis dashboard, so you can find the most optimal alternative for your needs.

READ ALSO

The State of HVAC 2026

Discover the 6 key HVAC trends for 2026 in this e-book packed with data-driven insights and actions to help you stay ahead in the changing market.

Download your copy today and see what no HVAC engineer can afford to ignore in 2026.

the state of hvac 2026 hysopt ebook

Ready to validate HVAC performance before construction?

Use Hysopt to simulate hydronic systems, compare design scenarios and reduce oversizing risk.

Explore more

Hysopt Simulator displaying a hydronic HVAC system model with simulation graphs used to analyse commissioning drift and system performance.
Blog

Hysopt Simulator for HVAC Commissioning Drift

Discover how Hysopt Simulator helps trace HVAC commissioning drift, identify hidden hydronic errors and improve long-term system reliability through physics-based simulation.
Modern commercial building façades, representing HVAC projects where system performance can differ from design intent after handover.
Blog

9 Reasons HVAC Projects Underperform After Handover

Discover 9 reasons HVAC projects underperform after handover and how connected design, simulation, commissioning and operational data help close the gap between design intent and real building performance.
Modern high-rise buildings viewed from below, representing complex commercial buildings where reliable hydronic HVAC commissioning supports long-term system performance.
Blog

How to Prevent Hydronic HVAC Commissioning Errors

Prevent hydronic HVAC commissioning errors before handover. Discover how connected design data, hydraulic validation and control testing improve efficiency, reliability and long-term system performance.