Blog

Bridging the Gap Between HVAC Engineering and BIM Modelling

When it comes to designing efficient HVAC systems, engineers and BIM modellers have long worked in parallel — not in sync. While engineers focus on hydraulic calculations and system functionality, BIM modellers concentrate on spatial layout and component placement. The result? A digital disconnect that often leads to errors, rework, and unnecessary costs. That’s where the Hysopt BIM Syncer, developed in collaboration with Autodesk®, changes the game.

Bringing engineering and modelling together

Through a seamless integration with Autodesk® Revit®, the Hysopt BIM Syncer enables real-time synchronisation between the P&ID and the BIM model. The integration allows both HVAC engineers and BIM modellers to work in their own familiar environments — the Hysopt software and Revit — while their data remains fully connected.

With just one click, users can generate, validate, and synchronise models across both platforms. This eliminates manual checking and reduces the risk of mismatches that typically lead to high failure costs and long project timelines

Accuracy, efficiency, and collaboration in one workflow

Unlike traditional BIM plug-ins, which force engineers to build an entire BIM model before running calculations, the Hysopt BIM Syncer flips that workflow.

Engineers can first perform accurate hydraulic calculations in Hysopt — including pipe sizing, flow rate calculations, and system balancing — before automatically pushing these updates into Revit.

Meanwhile, BIM modellers can continue to develop and refine the 3D model. Every change is validated and synchronised in real-time, ensuring both models reflect the same data — instantly.

This approach not only makes collaboration smoother but also ensures that every design is both technically correct and spatially coordinated, paving the way for smarter, faster, and more reliable HVAC project delivery.

Reducing costs, saving time, and improving quality

By continuously validating and synchronising the models, the Hysopt BIM Syncer helps reduce failure costs by up to 10% and eliminates hours of manual work.

No more tedious component-by-component checks or time-consuming corrections after construction begins.

In the end, the integration between Hysopt and Autodesk Revit delivers what every engineer and modeller wants: a unified, error-free workflow that enhances quality, shortens design cycles, and improves project profitability.

Want to dive deeper?

Download our whitepaper “Solving the Disconnect Between HVAC Engineering and BIM Modelling” to explore how the Hysopt BIM Syncer bridges calculation and design.

Discover the power of integration

The collaboration between Hysopt and Autodesk represents a major step forward for the HVAC and BIM industries. Together, they make it possible to bridge the long-standing gap between engineering and modelling — helping professionals deliver better systems, faster, and with full confidence.

Want to find our more? Check out the Hysopt BIM Syncer or read about our partnership with Autodesk.

Start your free trial

Request your trial today and experience the power of Hysopt first hand.

READ ALSO

The State of HVAC 2026

Discover the 6 key HVAC trends for 2026 in this e-book packed with data-driven insights and actions to help you stay ahead in the changing market.

Download your copy today and see what no HVAC engineer can afford to ignore in 2026.

the state of hvac 2026 hysopt ebook

Explore more

Blog

What Determines a NABERS UK Rating for Office Buildings

NABERS UK ratings reflect measured operational energy use in office buildings, making accurate design, modelling and ongoing performance management essential.
Blog

Understanding How BREEAM Ene 01 Awards Energy Credits

BREEAM UK NC Ene 01 credits are based on predicted energy performance, requiring accurate modelling and demonstrable efficiency gains in the BRUKL or SBEM assessment.
Blog

Modelling Heat Pumps Accurately for SAP 11 Compliance

SAP 11 introduces new modelling rules for heat pumps in UK residential buildings, requiring realistic seasonal efficiency data and temperature assumptions to demonstrate compliance.